Network Simulations

Failure & backup testing

NEW

Find out what happens when a cable, router or internet provider fails, before it does.

In plain words

What is it?

Things break: a cable is cut, a router dies, the internet provider goes down. Failure testing switches these off one by one on the model to see what stops working.

Then we design a backup (a second link, a spare route) and measure how quickly traffic moves over to it.

Who needs it

Sounds familiar?

“A business where work stops when the internet goes down”
“A bank, hospital or call centre that can’t afford downtime”
“A company with branches that depend on head office”
“Anyone paying for a backup line they’ve never tested”
What you get

What’s included.

  • Tests of each likely failure
  • A backup design that takes over automatically
  • Measured failover times
  • A plain-language report with what to change

Part of Network Simulations

See examples and questions for the whole service.

Network Simulations
How it works

Four clear steps.

  1. Understand your needs

    We learn how you work, how many people and devices you have and what must never go down.

  2. Model the network

    We build your network on the computer: equipment, links, Wi-Fi and traffic.

  3. Run the scenarios

    Busy days, failures, attacks and growth: we see where it slows down or breaks.

  4. Report and recommend

    A plain-language report, charts and an equipment list, explained to you.

Show how it looks

What it could look like.

Examples with sample data and made-up businesses, to show the kind of work we do. Not real clients.

Example network map with an internet link, firewall, core router, switches, Wi-Fi access points and serversEXAMPLE · SAMPLE DATA
Office / campus topologyA map of the whole network: internet, firewall, core router, switches, Wi-Fi access points and servers.
Example traffic view with links coloured green, amber and red by loadEXAMPLE · SAMPLE DATA
Live traffic viewEvery link coloured by how busy it is, so bottlenecks stand out.
Example failover test where traffic is re-routed through a backup providerEXAMPLE · SAMPLE DATA
Failover testThe main link is cut on purpose: traffic moves to the backup path and we measure how long it takes.
Start a project

Interested in Failure & backup testing?

Leave your number and we’ll call you back for a free chat about what you need. Or message us on WhatsApp.

Chat on WhatsApp
Get a quick call back

Tell us what you need. We'll call you.

Thanks! We'll call you soon.

Or WhatsApp us on +233 55 334 5627

Hi, I'm Arx.
How can we help you today?

Start a projectTry the simulationsChat on WhatsApp+233 55 334 5627